New Arrival China High Mast - MJLED-1601A/B/C Hot Sell Street Light Fixture With 20-200W LED – Mingjian Detail:
Product Details


Product Size

Product Parameters
|
Model No. |
Power |
Driver |
Input Voltage |
LED Type |
Material |
Install spigot |
Product Dimension |
|
Weight |
|||||||
|
MJLED-1601A |
120W-200W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
798x380x163mm |
|
CRI: Ra>70 |
|||||||
|
MJLED-1601B |
60W-120W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
560x241x111mm |
|
CRI: Ra>70 |
|||||||
|
MJLED-1601C |
20W-60W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
624x240x108mm |
|
CRI: Ra>70 |
Factory photo

Company profile
Zhongshan Mingjian Lighting Co., Ltd. is located in the beautiful lighting city-Guzhen town,Zhongshan city.The company covers and area of 20000 square meters,with 800T hydraulic linkage 14 meters bending machine.300T of hydraulic bending machine.two light pole production lines.new bring in 3000W optical fiber laser plate tube cutting machine.6000W fiber laser cutting machine.multi CNC bending machine.shearig machine,punching machine and rolling machine. We have professional,in dependent production capacity and technology of street light pole,high mast,landscape light pole,city sculpture,samrt street light pole,bridge high bay light,etc. The company accept customer’s drawing to customiized products.





FAQ
1. What are your prices?
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
2.How long is the sample production time?
Normally around 5-7 work days, except for special cases.
3.How to proceed an order?
First, let us know about your requirements or application details.
Second, we quote accordingly.
Third, customers confirm and pay the deposit
Finally, production is arranged.
4.Can you provide customized services?
Yes, we can provide one-stop solutions, such as ODM/OEM, lighting solution.
5.What kinds of payment methods do you accept?
You can make the payment to our bank account or Western Union :
30% deposit in advance, 70% balance before delivery.
6.What is your terms of payment?
We accept T/T, irrevocable L/C at sight usually. For regular orders, 30% deposit, balance before loading.
Product detail pictures:




Related Product Guide:
In an effort to finest meet up with client's requirements, all of our operations are strictly performed in line with our motto High High quality, Competitive Rate, Fast Service for New Arrival China High Mast - MJLED-1601A/B/C Hot Sell Street Light Fixture With 20-200W LED – Mingjian, The product will supply to all over the world, such as: Russia, Sri Lanka, Venezuela, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified product portfolios and the control of the industry trend as well as our mature before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.







